Construction Scheduling Software With a Real Critical-Path Engine
SiteMax Schedule is a full critical-path scheduler built into SiteMax. Drag one bar and the whole job recalculates. Issue a look-ahead and the crew already has it.
Building jobsite software since 2014.
Everything you need to build and run the schedule
A real critical-path engine
Forward and backward passes run on every change, counting working days from your calendar. Move a duration, add a link or log a delay, and the finish date, float and critical path update before you let go of the mouse.
Four views of one plan
Gantt, list, calendar and task board all read the same schedule, and the critical path stays visible in every one.

All four dependency types
Link activities finish-to-start, start-to-start, finish-to-finish or start-to-finish, with lead and lag in working days. Drag from one bar onto the next to create a link.

Constraints and deadlines
Pin a crane window or a contract handover with six constraint types and deadlines. When a date cannot be met, float goes negative and cascades upstream so you can see where to compress.

Progress comes from the crew
The tasks on the schedule are your SiteMax tasks. When a foreman ticks one off, the stream, the phase and the project all move.

Delays tied to RFIs and change orders
Log a delay against the RFI or change order that caused it. The delay extends the stream, cascades downstream and shows the record number on the bar.
Look-aheads the crew can work from
Pick streams or individual tasks, set a one to six-week window, assign the responsible company per activity and publish a frozen copy in list, timeline or resources view.
Baselines and variance
Save named baselines such as Contract and Rev B. Every bar shows a ghost of where it was meant to be and how many days it has drifted.
What-if scenarios
Duplicate the live schedule as a scenario, model a delay and compare it with the live plan. The cascade stays inside the scenario until you promote it.
Your cost codes
Pick from the codes assigned to the project in SiteMax, and group the schedule by cost code to see it the way the controller does.
Import and export
Bring schedules in from Microsoft Project XML, and export to PDF, Excel or Microsoft Project XML. Start from a template or copy another project's schedule.
Company portfolio
See every active project on one timeline, rolled up to project and phase bars, with critical-path and delay indicators.
Everything about a stream, in one panel
Click any bar to open its stream. Dates, status, constraints, tasks, progress and linked SiteMax records sit in one place.

Behind badge1
Streams that can't make their date are flagged with the days of slip.
2Your cost codes
Pick from the codes assigned to the project, not free text.
Responsible partner3
Assign the company that owns the work, from your SiteMax contacts.
4Working-day schedule
Start, end and duration in working days, with delays added to the span.
Status and actuals5
Enter actual start and finish, and the forecast recalculates from the data date.
6Constraints and deadlines
Pin a date and see negative float when the chain leading in can't make it.
Bar color7
Color any stream. Critical work keeps its red outline.
8Milestones
Anchor milestones to the stream's start or finish.
Task lists9
Create or bind a SiteMax task list. Its tasks drive the progress.
10Progress
Progress rolls up from the tasks, or set it manually.
SiteMax links11
Link contacts, submittals, equipment, materials and budget items.
From first bar to finished job in three steps
Build or import the schedule
Start from scratch, a template, another project or a Microsoft Project XML file, link the work and let the engine calculate dates, float and the critical path.
Issue look-aheads
Pick the work for the next one to six weeks, assign the responsible companies and publish a frozen copy the crew works from.
Update it every week
Crews tick off tasks, you set the data date and actuals, and the forecast, float and critical path recalculate from there.
Why contractors are moving schedules into SiteMax
A schedule only helps if it matches the work and the people doing it can see it. Here is how the two approaches compare.
A schedule file on one laptop
The schedule is rebuilt by hand when dates change, progress arrives by email and is retyped, and the look-ahead is printed on Friday and wrong by Tuesday. Delays get argued about later, and what-if means a copy of the file called FINAL v3.
SiteMax Schedule
The critical-path engine recalculates the job on every change. A foreman ticks a task and the schedule moves. Look-aheads are issued as frozen copies, delays are logged against the RFI that caused them, and scenarios cannot touch the live plan.
A schedule that keeps itself honest
It recalculates, you don't
The engine moves every linked activity, the float and the finish date, so nobody maintains dates by hand.
One version of the truth
The scheduler, project manager, foreman and owner each see their own view of the same plan.
Slips show up early, with the reason attached
Baselines show drift on every bar, delays carry the RFI or change order behind them, and negative float flags dates that cannot be met.
What is construction scheduling software?
Construction scheduling software plans the order, timing and dependencies of every activity on a job, then keeps that plan current as the work changes. The best tools calculate the critical path, so you know which activities set the finish date.
SiteMax Schedule is a full critical-path scheduler that lives inside SiteMax. Build the schedule once, or import it from Microsoft Project, and it recalculates every time something moves. Your field tasks, cost codes, RFIs and change orders are already in it, because they are already in SiteMax.
A schedule on one laptop is wrong by Tuesday
Most construction schedules live in a file on somebody's laptop. The schedule gets built in a desktop tool, printed on a Friday and is out of date by Tuesday. The field never sees it, and the office argues about which version is current.
SiteMax Schedule puts the schedule where the work already is. A two-day slip on footings cascades through the whole job the moment you drag the bar. Progress comes from the tasks your crews tick off, and look-aheads go to a crew that is already in SiteMax.
Scheduling software for every role on the job
The scheduler
A real critical-path engine with four dependency types, lead and lag, six constraint types and calculated float. Not a drawing of a schedule.
The project manager and controller
A list grouped by cost code, filtered to critical and sorted by float, baselines that show drift, and an Excel export with float and predecessors.
The superintendent, foreman and owner
Look-aheads to issue and a task board that updates the schedule, plus a portfolio of every active job on one timeline.
What to look for in construction scheduling software
These questions separate a real scheduler from a Gantt chart with dates typed into it.
Does it calculate the critical path?
Look for forward and backward passes, calculated float, all four dependency types and a critical path that updates on every change.
Does progress come from the field?
A schedule connected to the crew's real tasks stays current without anyone retyping updates.
Can the crew work from it?
Look for look-aheads you can issue as fixed copies while the master schedule keeps changing.
Can you bring your existing schedule in?
Check for Microsoft Project import, and exports your team and clients can use.
Can you explain every delay?
Delays linked to RFIs and change orders, baselines and what-if scenarios turn arguments into records.
Connect the schedule to the rest of the job
Construction scheduling software questions
Is SiteMax Schedule a real critical-path engine, or a Gantt chart?
A real one. It runs forward and backward passes, computes early and late dates for every activity, derives total float and finds the critical path. Float goes negative when a date cannot be met. It recalculates on every timing change, and the critical path stays highlighted in every view.
What is the critical path in construction scheduling?
The critical path is the longest chain of linked activities through a project. Any delay to an activity on it delays the finish date. Activities off the critical path have float, which is how far they can slip before they affect the finish. SiteMax calculates both and updates them every time the schedule changes.
Can I import my existing schedule from Microsoft Project?
Yes, from Microsoft Project XML. Save your file out of Project as XML and upload it. The hierarchy, durations, percentages, finish-to-start links and resources come across, and you get a report of what mapped cleanly and what did not. The binary .mpp format is not supported, so save as XML first.
Can I export my schedule?
Yes. Export to PDF with fit-to-page scaling, to Excel with WBS, dates, float, predecessors and cost codes, or to Microsoft Project XML, which round-trips back into the importer. You can also print any view on a clean layout with a title block.
How does progress get into the schedule?
From the crew. The tasks on the schedule are your SiteMax tasks, so when someone ticks one off on the board or in the list, the stream's percentage moves and rolls up through the phase to the project. Set a data date and actuals, and the forecast recalculates from there.
What is a three-week look-ahead, and can SiteMax issue one?
A look-ahead is a short-range plan of the work coming up, taken from the full schedule. In SiteMax, you tick the streams or tasks you want, choose a window, assign the responsible companies and publish a frozen read-only copy for the crew while the master schedule keeps moving.
Can I model a delay without changing my live schedule?
Yes. Duplicate the live schedule as a scenario and apply whatever delays you want. The recalculation stays inside the scenario, and you can compare it with the live plan. If it becomes the real plan, promote it, and your previous plan stays in the list.